Theatre ventilation setback under NETB 2026/1 - the BMS engineer's part

In July 2026 NHS England issued Estates Technical Bulletin NETB 2026/1, asking every trust with operating theatres to bring in overnight and weekend ventilation switch-off or setback (NHS England NETB 2026/1). It is one of the clearest, best-evidenced optimisation instructions the healthcare estate has had, and almost every requirement in it lands on the building management system.

This article is about the BMS engineer's part in that work. It is not a design guide and it does not replace the bulletin, HTM 03-01 or the trust's own procedures - read the bulletin itself before doing anything. And one point comes before all the others.

Governance first - this is never an integrator's decision alone

Theatre ventilation is a critical system. Any change to its schedules, setpoints, pressure regime or interlocks goes through the trust's Ventilation Safety Group (VSG), and day-to-day control of the system sits with the Authorised Person (Ventilation), with the Authorising Engineer (Ventilation) advising the group independently. The bulletin expects a project team that brings in infection prevention and control, theatre staff, the energy manager, finance and - in PFI hospitals - the PFI partner, who usually controls BMS changes there.

An integrator's role is to assess what the BMS can do, propose how it would do it, make the agreed changes under the trust's permit and change processes, and provide the evidence. It is never to decide that a theatre can be set back. Say this plainly in any proposal: a technical change should only be made by competent people, under the trust's governance, after the VSG has approved it.

Why the bulletin matters

The bulletin estimates savings of 132-286 MWh per theatre per year, and more than £43m a year across the NHS, from modelling published by Eames and colleagues in 2025. Theatres are several times more energy intensive than the rest of a hospital, and HVAC accounts for most of their energy. The bulletin notes that HTM 03-01 already allows setback, but that it has not been widely adopted - plant often runs at full output overnight in the belief that this protects sterility, although airborne contamination in a theatre comes from the people in it.

According to the bulletin, implementation cost runs from nothing for a simple schedule change to a few thousand pounds for full integration with the BMS and smart theatre panels.

Theatre ventilation energy by control strategy - MWh per theatre per year, with annual cost (modelled)
Conventional theatre, no heat recovery
Full time357 MWh - £38k
Setback in the evenings225 MWh - £25k
Off in the evenings145 MWh - £16k
Setback evenings and weekends104 MWh - £12k
Conventional theatre, heat recovery (effectiveness 0.5)
Full time212 MWh - £27k
Off evenings and weekends62 MWh - £9k
Ultra-clean ventilation (UCV) theatre, no heat recovery
Full time408 MWh - £51k
Setback in the evenings261 MWh - £34k
Off evenings and weekends122 MWh - £17k

Any change to theatre ventilation goes through the Ventilation Safety Group and the Authorised Person (Ventilation).

Modelled energy per theatre per year under each strategy, from the bulletin's Table 1. Real results depend on the existing regime. Source: NHS England NETB 2026/1 (July 2026), Table 1 - modelling by Eames et al. 2025, at October 2025 prices (27p/kWh electricity, 7p/kWh gas). Flags: UK, Modelled, not measured trust results.

These are modelled figures, not measured trust results - the bulletin is only a few months old. They show the scale, and they are a sound basis for a business case, but a pilot with sub-metering is what turns them into a number for a particular theatre.

The three control strategies

The bulletin describes three ways to run a theatre's ventilation down when it is not needed. In summary, in our own words:

Which strategy suits which theatre is a clinical and VSG decision. The BMS engineer's job is to say which ones the existing system can support, what would need adding, and how each would be tested.

What the BMS has to do

Whichever strategy is chosen, the bulletin's requirements translate into a short list of BMS functions:

Each line becomes a point to check on the existing system, a sequence to write or amend, and a test to witness.

Capability first, then a pilot

The bulletin is frank that not every BMS will be up to this, and that in some cases upgrading it may be cost effective. A sensible order of work:

1. Survey what exists. Controllers, spare inputs and outputs, panel types, existing interlocks, sensors in the theatre and the plant, and the state of the AHU, dampers and heat recovery. The BMS health check covers the general method. 2. Baseline the energy. Sub-metering on the theatre AHUs, logged long enough to show a normal pattern, so the change can be measured under IPMVP rather than estimated. Proving savings explains the options. 3. Propose, then pilot. A written proposal to the VSG covering the strategy, interlocks, temperature band, panel status, failure modes and back-out. The bulletin strongly advises a technical pilot on one theatre before rolling out. 4. Verify at both speeds. Annual verification should measure the system at full speed and in setback. If pressure differentials fall short of the bulletin's tolerance against design, investigate and re-verify.

Faults that get in the way

The bulletin lists the conditions that undermine both air change rates and energy: ageing AHUs, manual or outdated controls and setpoints, dampers set wrongly or failed, sensors and actuators out of calibration, clogged filters, high-grade filters fitted without the system being re-balanced, and poorly maintained heat recovery. A setback project usually turns some of these up, so allow for remedial work in the programme rather than discovering it during the pilot.

Carbon, and how to report it

Theatre savings are a mix of electricity (fans) and heat. When reporting carbon, state the conversion factor year. The 2026 UK government grid electricity factor is about a quarter lower than the 2025 one, so the same electrical saving counts for less carbon on paper - something worth explaining to an energy manager before the report lands.

Further reading

Which HTM governs which BMS point maps the wider hospital duties, and BMS cyber hygiene evidence covers what an NHS client's security lead will ask about remote access. BMS before heat pumps sets theatre work in the context of estate decarbonisation, and Commissioning a BMS covers witnessing and handover.

Related tools and training: the out-of-hours running cost, heat recovery savings and CUSUM tools are in tecTools, and the AHU commissioning and Servicing and optimising an existing BMS courses are in tecTraining.

Published guidance mentioned: NHS England NETB 2026/1, Generating energy efficiency savings through controlling theatre ventilation (July 2026), which supplements HTM 03-01 (2021); modelling by Eames et al. (2025). Figures quoted from the bulletin are modelled. Any change to theatre ventilation needs the Ventilation Safety Group's approval and the Authorised Person (Ventilation)'s control.

More articles from 3EC

3EC logo