Smoke control and fire interfaces - where the BMS stops
Almost every air handling job touches the fire alarm somewhere. A volt-free contact lands in the BMS panel, an air handler stops when it opens, and dampers in the ductwork close. Because the wiring is simple, it is easy to treat the whole thing as a controls job. It is not. What the plant does in a fire is a life safety decision, made in the building's fire strategy and written down as its cause and effect. The BMS carries some of it out and reports on it. It never decides it.
This article is for integrators and their engineers, and for FM and M&E teams who manage buildings with smoke control or fire interfaces. Treat it as background reading. It is not a guide to designing fire or smoke control, and reading it qualifies no one to design, commission, test or maintain fire safety systems - that takes the certification, training and competence the work demands. If anything below appears to disagree with the fire strategy, its cause and effect, or the specialists who own the system, follow them.
What Approved Document B asks of ventilation
In England, Approved Document B Volume 2 gives the guidance for buildings other than dwellings (Approved Document B Volume 2, 2019 edition incorporating 2020, 2022, 2025 and 2026 amendments). Its section on mechanical ventilation and air conditioning makes a handful of points that every controls engineer should recognise:
- Ductwork must not spread fire and smoke through the building (10.6).
- Protected escape routes - where ductwork enters or leaves each section of one, a fire and smoke damper should be fitted, worked by a smoke detector or a suitable fire detection system, and it should close when smoke is detected (10.8).
- Recirculating systems - smoke detectors go in the extract duct before the point where recirculated air is split off, and before any filters. On detecting smoke they should either shut the system down at once or switch it from recirculation to extract, so smoke is sent outside (10.9).
- Compatibility - under fire conditions, ventilation and air conditioning should be compatible with any smoke control system, and both designs need to take account of each other (10.11).
- Fire-separating elements - where ducts pass through them, fire performance is kept by one or more of four methods, including thermally activated fire dampers and automatically activated fire and smoke dampers triggered by smoke detectors (10.12).
- Dampers - fire dampers and fire and smoke dampers should conform to BS EN 15650 (10.19, 10.20), and there should be access to the damper and its mechanism for inspection, testing and maintenance (10.18).
Notice the word "either" in 10.9. Which of the two outcomes applies is a design decision, and the cause and effect records it. Neither is the BMS engineer's call.
Interfaces must be reliable
Approved Document B also says that where a fire detection and alarm system triggers other systems, the interface between them must be reliable, with particular care where it passes through another system - and that the relevant part of BS 7273 should be followed (1.17). For a BMS, that is a strong hint about where things should and should not be wired. If the design expects a fan to stop by a hard-wired fire contact in its starter circuit, it does not rely on the BMS controller to do it, and the BMS must not be put in the path. Hand/Off/Auto, safety chains and the BMS enable shows how a hard-wired contact in a starter circuit sits outside the BMS.
Healthcare guidance makes the same point in its own terms: how ventilation is controlled in a fire belongs in a fire and smoke control strategy agreed for the site (HTM 03-01 Part A, 7.16). Nothing about that is special to hospitals.
Three kinds of damper
Approved Document B lists fire dampers, fire and smoke dampers, and smoke control dampers separately when it describes the records a complex building needs (19.7). They are different products, classified and tested differently, and one should never be assumed to behave like another. None of them should be pressed into comfort or energy control, and none should be driven by BMS logic the fire strategy does not call for.
Smoke control is a system of its own
Smoke control systems do one of two main jobs, sometimes both:
- Pressure differential systems keep a stair, lobby or firefighting shaft at a slightly higher pressure than the accommodation next to it, so smoke is pushed back rather than drawn in. Approved Document B refers to pressurisation systems complying with BS EN 12101-6 (for example, 2.28).
- Smoke and heat exhaust removes smoke and heat, by natural vents or powered fans - in corridors, atria and car parks, for example - to keep routes usable for escape and for the fire and rescue service.
Each is engineered as a complete system, usually with dedicated fans, dampers, controls and protected power, and its performance objectives are tested against the design. The BS EN 12101 series covers their components, BS 7346-8 is a code of practice for their planning, design, installation, commissioning and maintenance, and Approved Document B refers to BS 9999 on several related topics. All are paid standards, cited here for their subject.
Where the BMS stops
On most projects the BMS's role at a smoke control or fire interface is narrow:
- It monitors. Fan and damper status, faults and mode, shown clearly to the operator and alarmed where the design asks.
- It stands aside. No energy feature - optimum start, night setback, time schedules, speed trimming, duct pressure reset - should ever reach a smoke control fan or damper, and ordinary air handler sequences must not work against a fire mode.
- It defers to the fire strategy for the grey areas. Whether a duct smoke detector shutdown or a duct static high limit stays active in a smoke mode is not obvious - the fire strategy says which.
- It gives way to the firefighters. Where a firefighters' control panel is fitted, it takes priority over everything else.
A cut cable and a reset
Two questions catch engineers out because the answer feels as though it should be universal. It is not.
What happens if the interface cable is cut? What the plant does when that cable is broken is set by the design, not by habit or by what the last job did. The interface should fail to the safe state the design defines. Find that state in the design and the cause and effect, and prove it; never assume it.
What happens when the alarm resets? Some plant is meant to restart by itself, some to wait for a manual reset. That too is set by the fire strategy and its cause and effect. Ask for it before you program anything.
Who is responsible
Once a building is occupied, the Regulatory Reform (Fire Safety) Order 2005 places fire safety duties on the responsible person. GOV.UK describes the responsible person as the employer, owner, landlord or occupier, or anyone else with control of the premises such as a facilities or building manager, and says they must carry out and regularly review a fire risk assessment and put in place, and maintain, appropriate fire safety measures (GOV.UK - fire safety in the workplace). Where there is more than one, they must work together.
When building work is done, Regulation 38 requires fire safety information to be handed to the responsible person. For complex buildings Approved Document B says that information should include the fire safety strategy, an outline cause and effect matrix, and the design, mode of operation and control systems of any smoke control system or ventilation system with a smoke control function (19.6, 19.7). Witnessed interface results belong in that record.
What the BMS engineer does - and does not
Does: connects and tests the interface the design calls for, in front of the fire strategy owner and the system's specialist; makes status easy to read; keeps the signed results; agrees any interface test in advance with the responsible person and the fire alarm contractor; and reports, rather than fixes, anything out of place - a smoke fan on a time schedule, a fire damper driven by everyday logic, an alarm nobody has cleared.
Does not: design or re-engineer a smoke control system, or adjust how it performs; edit a cause and effect; bridge, link out or override a fire interface to get plant running; pull smoke control fans or dampers into energy saving; or test fire safety systems without being appointed and competent to do so.
Commissioning a BMS covers where fire interfaces sit in the wider commissioning sequence, and Which HTM governs which BMS point covers the healthcare guidance in more detail.
Sources mentioned: Approved Document B Volume 2 (2019 edition incorporating the 2020, 2022, 2025 and 2026 amendments), paragraphs 1.17, 2.28, 10.6-10.20, 19.6-19.7 and Regulation 38; HTM 03-01 Part A (2021), 7.16; the Regulatory Reform (Fire Safety) Order 2005; GOV.UK guidance on the responsible person; BS EN 12101, BS 7346-8, BS 9999, BS 7273 and BS EN 15650, cited by subject. The fire strategy, its cause and effect, and the fire engineer govern throughout.
More info
- AHU variants - a tecTraining course
Sign in to go straight to the lessons.
Try the tool
- Commissioning sheets - in tecTools