Hand/Off/Auto, safety chains and the BMS enable - read the panel before blaming the controls
A BMS alarm says a fan is "commanded on - not running". The controls engineer looks at the outstation, sees the output on, and the conversation stalls. The fault is very often not in the BMS at all. It is in the panel: a safety link open, an overload tripped, a switch in the wrong position, or a feedback contact wired to the wrong input.
This article is for integrators and the panel builders and electricians they work beside, and for FM teams who want to understand what the BMS can and cannot see. It walks through one motor control rung - Hand/Off/Auto, the BMS enable, the safety chain and the feedback - so that the next "not running" alarm starts with the drawing rather than an argument. Panel design and testing are electrical work: follow the project specification, the relevant standards and the maker's instructions, and work only within your competence.
Reading one rung
Control schematics are drawn as a ladder. The two uprights are the control supply, and each rung is one circuit between them: contacts in series, ending in the coil they switch. Current flows across the rung only when every contact in its path is closed. Contacts are drawn as they sit with nothing energised, so a normally closed contact is drawn closed.
A typical fan or pump rung, left to right, has the safety chain first, then the Hand/Off/Auto switch, then - in the Auto path only - the BMS enable contact, and finally the contactor coil. The contactor's auxiliary contacts, and better still a device that proves air or water is moving, report back to the BMS.
Hand, Off and Auto
- Off - nothing can start the motor.
- Auto - the BMS decides. A relay output from the controller, the BMS enable, closes a contact in the rung and the starter pulls in.
- Hand - the motor runs from the switch alone, so plant can be tested or kept running if the controller is out of service.
The key point is what Hand bypasses. It bypasses the BMS, not the safety chain. The overload, the emergency stop and the fire alarm contacts stay in the rung in every switch position, so a trip still stops a motor running in hand. Whether hand positions are allowed at all, and what they may bypass, is set by the project specification; some specifications do not allow them on panel doors.
The safety chain
A safety chain is a string of normally closed contacts that must all be made for the plant to run. Because each link is normally closed, a broken wire or a missing link stops the plant too - the chain fails to the safe side. Typical links include:
- The overload - the motor protection relay's normally closed contact opens on a trip and drops the starter out.
- Emergency stops - pressed, they open the chain; released, they must not restart the plant without a deliberate reset. BS EN 60204-1 (check the current edition) covers emergency stopping for machinery and is often used as a guide for plant panels.
- The fire alarm shutdown relay - opened by a volt-free contact from the fire alarm panel under BS 5839-1 arrangements (check the current edition). Which plant stops and which keeps running for smoke control comes from the building's fire strategy and cause and effect, not from the panel designer or the controls engineer.
- Frost thermostats, door switches and high limits - where the design puts them in the hard-wired chain.
Some chains belong to other trades. A gas valve interlock, for example, is part of the gas installation and its design and testing belong to people competent in gas work; the BMS usually monitors it rather than forming part of it.
What the BMS sees - and what it does not
The BMS knows two things about the rung: what it asked for (its enable output) and what it is told back (its inputs). Everything else it has to infer.
- Run feedback. An auxiliary contact on the contactor shows the starter pulled in. A current switch, or a differential pressure switch across the fan or pump, shows the motor is actually moving air or water - a better proof, because a contactor can pull in while a belt has snapped.
- Trip feedback. The overload's normally open contact can report a trip to a separate input.
- Auto feedback. A spare contact on the switch can tell the BMS it is in Auto - so it knows when it is not in control.
From those, it raises the alarms that matter. CIBSE Guide H discusses interlocks, status feedback and plant failure alarms in building control systems. In practice:
- Enable on, no run feedback after a set delay - "commanded on - not running". A safety link is open, the overload has tripped, the switch is in Off, or the feedback itself has failed.
- Run feedback with the enable off - the plant is running in Hand.
Those alarms only work if the feedback contacts are wired, numbered and labelled as the drawing says, and appear on the points list with the same names. That is why the schematic and the IO schedule should be checked together.
Before blaming the controls
When a "commanded on - not running" alarm arrives, a short sequence finds most causes without touching the BMS configuration:
1. Look at the panel. Switch position, overload status, emergency stop buttons, and the fire alarm relay. A tripped overload often shows on the device itself. 2. Follow the rung on the drawing. Wire numbers and cross-references show every contact in the chain and where each relay's other contacts are used. 3. Check the enable reached the panel. The controller output on, the interposing relay pulled in, its contact closed. 4. Check the feedback. Is the run signal coming from the device the drawing says, wired to the input the points list says, set up with a sensible proving delay? 5. Only then look at the BMS logic - interlocks, minimum off times, and anything holding the output in the priority array (see Who is holding that point?).
All live testing follows safe isolation and your company's procedures; the HSE's HSG85 sets out safe working practice for electrical work.
Commissioning the interface
On a new panel or a replacement, prove each rung end to end: with the switch in Auto, the BMS enable starts and stops the plant; in Hand it runs without the BMS and the BMS raises its hand alarm; each safety link, opened in turn, stops the plant in both Hand and Auto and shows the expected alarm; and each feedback reaches the correct input. Commissioning a BMS covers where these checks sit in the wider sequence.
The panel side of this work is where drawings and BMS points meet. We are building tecWire, a panel and schematic design tool for that job - coming soon.
Sources mentioned: BS EN 60204-1 (electrical equipment of machines - check the current edition); BS 5839-1 (fire detection and fire alarm systems - check the current edition); CIBSE Guide H, Building control systems (2009); HSE HSG85, Electricity at work: safe working practices. Panel design, settings and interlocks are for the project's designer and specification.