Selling into public estates - DECs, RM6378, KPIs and gate items
Public buildings are a large, stable market for BMS service: offices, courts, police and fire stations, libraries, leisure centres, museums, schools and hospitals, owned by bodies that will still be there in twenty years. But public money comes with rules, and most of them are about how a supplier is chosen and held to account rather than about the engineering.
This article is for integrators who want to work on public estates. It covers the public metrics that make optimisation visible, how the new government frameworks are shaped, what the Procurement Act changes about performance, and the gate items a supplier needs before it can even be considered. Rules change often in this area, so check the current guidance before any bid.
The buildings are the lagging area
The central government estate's own figures make the case. The Greening Government Commitments report covering April 2021 to March 2024 showed overall greenhouse gas emissions 41% below the 2017-18 baseline - but direct emissions, mostly from buildings, were down only 15%, and water use only 1% against a target of at least 8% (GOV.UK GGC report). The same report estimates that lower energy use saved government about £298m on bills in 2023-24. A new framework to 2030 was expected to follow a review; its final targets could not be confirmed at the time of writing.
| All greenhouse gas emissions | 41% |
|---|---|
| Direct emissions - buildings and operations | 15% |
| Water use | 1% (target at least 8%) |
Lower energy use cut government bills by an estimated £298m in 2023-24. The framework to 2030 was still awaited at the time of writing.
Heat pumps funded by the Public Sector Decarbonisation Scheme add to the picture. Phase 4 closed to new applications in November 2024 and its grant funding runs to 31 March 2028 (Salix). Every funded heat pump needs controls set up, tuned through the seasons and evidenced - a service market that does not depend on new grant rounds. BMS before heat pumps covers that work.
DECs - a public score you can contract against
In England and Wales, a Display Energy Certificate and advisory report are required for buildings over 250 m² occupied by public authorities and frequently visited by the public (GOV.UK DEC guide). For buildings over 1,000 m² the DEC is renewed every year; for smaller buildings it lasts ten years. Northern Ireland has its own equivalent rules, and Scotland does not require DECs in public buildings.
An annual DEC on a large building is a public, independent measure of operational energy - exactly what BMS optimisation changes. A year-on-year improvement in the operational rating is a simple key performance indicator an integrator can offer to work towards, alongside a measured baseline. Do not promise a rating; promise the work and the measurement.
How the frameworks are shaped now
The Crown Commercial Service became the Government Commercial Agency on 1 April 2026. Its open framework RM6378 for facilities management and security started on 19 August 2026, replacing RM6232 and RM6257 (GCA RM6378). Its lots cover total FM, hard FM, soft FM and security. BMS and energy services are not named as a lot - BMS work sits inside hard FM or total FM. Eighteen firms were appointed to the top total FM lot (Construction Enquirer).
In practice, most smaller integrators reach central government estates as subcontractors to the Tier 1 FM providers who hold those lots. That shapes the offer: the integrator's customer is often the FM provider, whose own contract has KPIs, carbon requirements and security rules that flow down.
In the NHS, the NHS Shared Business Services hard FM framework has a dedicated BMS lot; its successor lists a BMS and BEMS lot covering design, installation, upgrade, commissioning and maintenance, though its award status could not be confirmed at the time of writing. Councils use a range of regional and national frameworks; they are not bound by central government procurement policy notes, but often mirror them.
The Procurement Act puts KPIs in public
The Procurement Act 2023 applies to procurements started on or after 24 February 2025. For contracts over £5m, the buying authority must set and publish at least three key performance indicators, unless that is inappropriate, and assess performance against them in a contract performance notice at least every 12 months (GOV.UK KPI guidance; GOV.UK contract performance notices). Wales has its own regulations and guidance.
An integrator working under a large contract - directly or as a subcontractor - should expect its performance to feed a published rating. That argues for KPIs the integrator can actually measure and control:
- response and attendance times by priority;
- alarm closure times and standing alarm counts;
- planned maintenance completed on time;
- energy against an adjusted baseline, with the method agreed at the start;
- sensor calibration rounds completed - because a drifting sensor can make every other figure look fine.
Gate items - what you need before you can bid
These are the documents a public buyer, or a Tier 1 FM provider flowing down its own obligations, is likely to ask for. Without them, the engineering never gets assessed.
- A carbon reduction plan. Under PPN 006 (February 2025), central government contracts above £5m a year need one, unless not relevant or proportionate (GOV.UK PPN 006). The NHS has its own tiered rules: from April 2024 a full plan for larger contracts and a net zero commitment for smaller ones, and from 1 April 2027 new procurements require a publicly reported plan covering global Scope 1, 2 and 3 emissions (NHS England 2027 requirements).
- Cyber Essentials. Under PPN 014, central government departments, their agencies and NHS bodies may require Cyber Essentials, Cyber Essentials Plus or an equivalent (GOV.UK PPN 014). For remote BMS access it is effectively the entry ticket - but it is a floor, not an operational technology security standard. BMS cyber hygiene evidence covers the rest.
- Security vetting. Engineers working on government, courts, police and some NHS sites can expect personnel security checks, from baseline checks up to higher clearances on some sites. The exact level varies by estate and was not confirmed against the current government and police vetting guidance - ask the buyer early, because clearances take time.
- Safeguarding checks for schools and some care settings, and a clear policy on remote access.
- Insurance, health and safety and quality accreditations, which the framework holder will specify.
Zoning the 24-hour estate
Civic buildings often mix 24-hour areas - custody suites, control rooms, server rooms, fire station dormitories - with office-hours areas. A common waste is whole-building plant running all night for a small 24-hour load. Separate schedules and zoning for the 24-hour areas is the obvious first measure, and it shows clearly on a DEC.
Shaping the offer
A public-estate service built on this might include a DEC-linked energy review, heat pump controls optimisation, a KPI schedule agreed at the start, monthly reporting that feeds the contract performance notice, and a tender readiness pack: carbon reduction plan, Cyber Essentials certificate, vetting records and method statements. Selling BMS service contracts covers the commercial side.
Related tools and training: the SI sales pack builder, service tier pricing, BMS cyber evidence checklist and M&V option picker tools are in tecTools, and the Proving and pricing BMS service course is in tecTraining.
Sources mentioned: GOV.UK Greening Government Commitments report (2025); Salix on PSDS Phase 4; GOV.UK DEC guide; Government Commercial Agency RM6378; Construction Enquirer (September 2026); Procurement Act 2023 KPI and contract performance notice guidance; PPN 006 and PPN 014; NHS England carbon reduction plan requirements (2027). Vetting levels were not confirmed against the primary guidance. Procurement rules change - check the current versions before bidding.