Optimisation for landlords - NABERS, NZCBS, MEES 2031 and green leases

For commercial landlords, the pressure on building performance has shifted. The legal minimum for letting is still an EPC rating, but the targets landlords set themselves - and the ratings investors and tenants now ask about - are measured at the meter. That shift makes the BMS one of the most useful assets in a portfolio, and BMS optimisation one of the cheapest ways to move a measured rating.

This article explains the ratings and regulations that matter, what a well-documented UK office case found, and how an integrator can shape a service offer around what a landlord actually needs.

Measured ratings - NABERS UK and the Net Zero Carbon Buildings Standard

NABERS UK Energy for Offices rates a building's actual metered energy use over 12 months, on a star scale. In February 2026 a 4.5-star NABERS UK rating was recognised as "deemed to satisfy" the operational energy requirement of the UK Net Zero Carbon Buildings Standard (NZCBS) for existing offices (Facilitate). For a landlord seeking a net zero claim for an existing office, that is a direct link between measured energy and a recognised standard.

Research by the Better Buildings Partnership found office EPCs correlate poorly with actual metered energy use (BBP REEB EPC Insight 2024). An EPC is an asset rating - it models the building as designed. NABERS and the NZCBS measure the building as run. BMS work - schedules, setpoints, sequences, ventilation rates - moves the in-use rating directly, and the asset rating only partly. That is the case for optimisation in one sentence.

A measured UK case - and what it found

The best-documented UK example is a 1967 multi-let office in Croydon of about 17,600 m², described in CIBSE Journal (CIBSE Journal). Optimisation driven by analysis of BMS data - with no new plant - included reducing ventilation at set times, matching fan schedules to occupancy, removing simultaneous heating and cooling, and running boilers only when needed. Over nine months the building used 28% less energy than its baseline (the model had forecast 26%), saving £171,000 and 232 tCO2. Savings were measured under IPMVP against a calibrated model meeting ASHRAE Guideline 14 limits.

What the work found along the way is just as useful. Outdoor air dampers were seized, so fan speed had to be used to control fresh air. Reheat valves had corroded and stuck fully open, so the heating flow temperature was lowered - with a weekly pasteurisation cycle kept in place. Two lessons for anyone pricing similar work:

One building is not a prediction. The large North American studies put median savings from recommissioning at about 6%, and older multi-let buildings like this one can sit well above that.

What the large studies measured - and the modelled ceiling - Whole-building energy savings, % (medians)
Recommissioning existing buildings - 446 projects (measured)6.4% (IQR 3.4-12.4%)
Fault detection and diagnostics (FDD) - after two years (measured)9%
Potential found in BMS trend data - 151 buildings (potential)12%
Optimised controls across the whole stock (modelled)29%

Medians, not promises - individual results ran from close to zero to over 50%.

The large-study medians sit well below one strong UK case - which is why a landlord should measure, not assume. North American. Source: Crowe et al. 2020 (LBNL); Smart Energy Analytics Campaign, cited in Crowe et al. 2023 (LBNL); Katipamula et al. 2021 (PNNL); Fernandez et al. 2017 (PNNL, DOE summary). Flags: North American, Top bar modelled.

Landlords already buy this as a programme

Landlords with portfolio targets commission BMS reviews across many buildings at once. Landsec, for example, reviewed BMS settings and put the recommended changes in place at 11 London assets in 2023/24, expecting 5-15% per building, against a portfolio target to cut energy intensity by 52% by 2030 (Landsec 2025). Those are expected savings, not measured ones - but they show how the work is bought: as a repeatable programme, with consistent reporting across assets.

An integrator selling into that market needs a repeatable method: the same survey, the same trend analysis, the same findings format and the same before-and-after reporting on every building.

Separating landlord and tenant plant

Multi-let buildings bring a complication that single-occupier buildings do not. Landlord targets are usually whole-building, including tenant areas, so landlords need tenant energy data - and tenants are often wary of sharing it. That is why the BBP Green Lease Toolkit, relaunched in January 2024, includes data-sharing clauses giving the landlord access to tenant utility data, with confidentiality and anonymisation (Burges Salmon).

The BMS is often the only system that sees both sides. An integrator who can:

is providing exactly what the green lease data clause needs. It also makes optimisation fairer: a tenant whose fit-out runs AHUs all weekend can be shown the effect, rather than the cost disappearing into the service charge.

MEES 2031 - the date has moved

For privately rented non-domestic buildings in England and Wales, the Minimum Energy Efficiency Standards still set EPC E as the legal minimum for letting. In June 2026 the government dropped the proposed EPC C milestone for 2027 and said it intends to require EPC B from 2031 for buildings over 1,000 m², "where cost effective", with legislation still to come (GOV.UK).

For an integrator, the honest message is that MEES is a capital and asset-rating question, mostly about fabric and plant, and BMS optimisation only partly feeds an EPC. Where controls do count in the EPC model, a properly specified and commissioned BMS helps. But the near-term driver for most multi-let offices is measured performance - NABERS, the NZCBS and portfolio intensity targets - where the BMS does the heavy lifting.

What tenants get out of it

Optimisation is not only a landlord story. Tenants pay for energy through the service charge or their own meters, and they notice comfort before they notice kWh. The faults an optimisation project removes - simultaneous heating and cooling, ventilation running to empty floors, zones too hot in the morning and too cold by mid-afternoon - are the same faults behind most comfort complaints. A tenant who sees fewer complaints, a lower service charge line and a clear monthly report is easier to keep at lease renewal.

Tenants with their own net zero targets also need data from the building, just as the landlord needs theirs. Reporting that shows each tenancy its own profile, alongside the base-building figures, serves both sides of the green lease.

Reporting that stands up

Investors and rating schemes look for evidence they can audit. Three habits help: keep at least 12 months of reconciled metered data, so a NABERS rating or an NZCBS claim has a clean starting point; measure savings against an adjusted baseline under IPMVP, with the model's fit statistics shown rather than just the headline number; and keep a record of every change made to the BMS, so a jump or dip in the data can be explained.

Shaping the offer

A landlord-facing BMS service might include:

Proving savings covers the measurement side, The BMS health check the survey, and Selling BMS service the contract shape. What the studies really say explains the evidence behind any savings figure, and Fault detection on a BMS turns the common faults into rules a monitoring service can run.

Related tools and training: the BMS health check, findings to proposal, CUSUM savings tracker and degree-day tools are in tecTools. On sites running tecGfx, alarms, analytics, work orders and reports sit together, which helps when pulling a year's evidence across a portfolio.

Sources mentioned: NABERS UK and the UK Net Zero Carbon Buildings Standard (February 2026 recognition); BBP REEB EPC Insight (2024); CIBSE Journal, Croydon office case (2023, UK, measured under IPMVP); Landsec Sustainability Performance and Data Report 2025 (expected savings); BBP Green Lease Toolkit (2024); GOV.UK MEES interim response (June 2026). Savings depend on the building and how it is run.