Who is holding that point? The BACnet priority array and forgotten overrides
"The BMS is ignoring the schedule." It is one of the most common complaints on a service visit, and on a BACnet site one of the most common causes is not a fault at all. Somebody, at some point, commanded the point by hand - to test it, to deal with a complaint, to get through a hot afternoon - and never released it. The control logic is still running and still writing its value. Nothing happens, because a higher command is in the way.
This article is for integrators and FM teams. It explains the BACnet priority array in plain terms, shows how a forgotten override hides, and sets out a simple audit for finding them. The behaviour described is defined in ANSI/ASHRAE 135, the BACnet standard; a readable introduction is Bill Swan's The Language of BACnet on bacnet.org.
Sixteen slots, one winner
In BACnet, outputs - and some value objects - are commandable. Their Present Value is not written directly. Instead, each write lands in one of sixteen priority slots, numbered 1 (highest) to 16 (lowest). The device looks down the list from the top, and the first slot holding a value wins. That value becomes Present Value, and the output follows it.
A few slots have names in the standard. Slots 1 and 2 are for life safety, manual and automatic. Slot 5 is for critical equipment control. Slot 6 is for minimum on and off times, which protect plant from short-cycling. Slot 8 is for a manual operator. The others are left to the system designer, and a write that names no priority at all goes in at 16.
When every slot is empty, Present Value falls back to the object's Relinquish Default.
How an override hides
Picture an AHU supply fan. Its schedule writes On and Off at priority 16 every morning and evening. One hot afternoon an operator, or an engineer on a visit, commands the fan On at priority 8 to keep a meeting room cool. The fan runs.
That evening the schedule writes Off at 16. The fan keeps running, because slot 8 still holds On and 8 beats 16. The schedule is correct, the logic is correct, the graphic may even show the schedule as Off - and the plant runs all night, every night, until someone clears slot 8.
The same pattern turns up everywhere:
- a valve held at 100% during commissioning that never returned to its loop;
- a damper driven shut for a complaint and left there;
- a heating pump commanded off for a summer and still off in November;
- a setpoint object written at a high priority by a graphic button nobody realised was commandable.
Releasing is not the same as writing
This is the point that catches people out. Writing a new value at priority 8 replaces the value in slot 8 - it does not empty the slot. If the operator who overrode the fan On later writes Off at priority 8, the fan stops, but slot 8 still owns it. The schedule still cannot run it.
To give control back, you relinquish the slot: write a null at the same priority. Most front ends offer this as Release, Auto or Relinquish on the point's command menu. Only then does the next slot down - the schedule at 16 - take over again.
Some tools write at a fixed priority without saying which one. Find out which priority your front end, your graphics buttons and your engineering tool write at, and make sure everyone on the team knows.
Other things that look like an override
Before blaming the array, check the point's status. Every point object carries Status Flags - four flags for In Alarm, Fault, Overridden and Out Of Service.
- Out Of Service is the one to watch. With it set, Present Value stops following the real input or output, so a test value left behind on an input looks exactly like a stuck sensor, and the logic acts on a number that is not real.
- Overridden means something local to the device has taken over - a hand switch on the controller, for example - which the BACnet priority array cannot see past.
- Minimum on and off times at slot 6 can make an output look slow to respond. That is protection working, not a fault.
And outside BACnet altogether, a Hand/Off/Auto switch in the panel can run plant regardless of anything the BMS commands, so check the panel switches as well. And a point that does not answer a read at all points to the network rather than the priority array - MS/TP that stays up covers the bus.
An overrides audit
A short audit finds most forgotten commands and is a natural part of a service visit:
1. List every commandable point with anything written above its normal control priority - many front ends can report this directly, or a BACnet browser can read each priority array. 2. List every point Out Of Service, and every input with a manual value. 3. For each one, find the owner. Who wrote it, when and why? A note in the log is the best evidence; the client's FM team often knows the rest. 4. Agree what stays. Some holds are deliberate - plant out of use, a known fault awaiting parts. Record them with a reason and a review date. 5. Release the rest at the priority they were written at, and watch each point return to its schedule or loop. 6. Report the count. "Fourteen points released, three held with reasons" is a clear line in a service report, and the trend is worth tracking from visit to visit.
Then stop it coming back: timed overrides that expire on their own, operator training on Release versus writing a value, alarms on points held in manual for more than a set time, and graphics that show clearly when a point is not in automatic control.
Why it matters
Forgotten overrides are one of the quiet causes of out-of-hours running and lost comfort. They do not raise faults, they do not show on most dashboards, and the plant looks healthy. A BMS health check that reads the priority arrays often finds them within the first hour.
Sources mentioned: ANSI/ASHRAE Standard 135 (BACnet), command prioritisation, Status Flags and Relinquish Default; W. Swan, The Language of BACnet - Objects, Properties and Services (bacnet.org). How each front end names and reports priorities varies - check its documentation.
More info
- MS/TP and BACnet basics - a tecTraining course
- Servicing and optimising an existing BMS - a tecTraining course
- BMS fundamentals - a tecTraining course
Sign in to go straight to the lessons.
Try the tool
- BMS health check - in tecTools
- BMS service visit - in tecTools