Condensation on chilled beams and fan coils - the dew point guards
Water dripping from a ceiling is the quickest way for a cooling system to lose a client's confidence. On chilled beams and chilled ceilings it is a controls problem as much as a design one, because the water runs close to the room's dew point by design - and on a humid morning the room can catch up with it. Fan coils run colder and are built to make condensate, but they bring their own drain and alarm duties.
This article is for integrators and engineers who commission or service chilled beams, chilled ceilings and fan coils. It covers the arithmetic of dew point, the three common guard strategies, how to prove them by action rather than by reading, and where fan coil condensate checks fit.
Why beams sit near the dew point
A chilled beam cools with water that runs warmer than fan coil water. CIBSE Journal's CPD module on chilled beams gives typical chilled water temperatures of 14 to 18°C with a 2 to 3 K rise (CIBSE Journal CPD, 2024 - a sponsored module). Those are typical, not acceptance values - the design sets them. Active beams drive primary air through nozzles to induce room air across the coil; passive beams rely on natural convection.
The dew point is the temperature at which the room's moisture starts to condense on a surface. Keep the beam's surface above it and the beam stays dry. Let it fall below and water forms, gathers and drips.
The arithmetic that makes it real
Room air at 24°C and 50% relative humidity has a dew point of about 12.9°C, so 15°C chilled water leaves a comfortable margin. At 60% the dew point rises to about 15.8°C - and the same water is now below it. Open windows, a late start on a humid summer morning, a meeting room packed with people or a failed primary air dehumidifying coil can all do this. A psychrometric chart or calculator gives the dew point from temperature and humidity in a moment.
The margin between dew point and water temperature comes from the specification. The controls' job is to keep it, whatever the weather does.
Three common guard strategies
Designers use a handful of answers, often in combination. Public UK guidance describes holding the water above dew point or closing valves on a dew point or humidity signal; a European controls guide in our Tech Docs library breaks this into four variants:
- Hold the circulating water above dew point. A mixing valve raises the chilled water flow temperature as the room dew point rises - centrally from the most critical room or from outside conditions, or locally per zone. Cooling capacity falls, but the beams keep working.
- Close the valve on a condensation sensor. A sensor clipped to the chilled water supply pipe at the beam detects moisture forming and closes that zone's valve. It is a last line, not a control strategy.
- Close valves on room humidity. The room or zone dew point is calculated from temperature and humidity, and the valve closes when it gets too close to the water temperature.
Some newer schemes adjust water temperature continuously to keep some cooling available rather than shutting it off. Find out which strategy your project uses before you start - it decides what you prove, and which single sensor everything depends on.
Humidity sensors drift
Every one of these strategies depends on a humidity measurement somewhere, and capacitive humidity sensors drift. UK healthcare guidance warns about it in air handling plant (HTM 03-01 Part A, 9.214) (NHS England). A sensor reading 8% low makes a room look safe when it is not; one reading high shuts cooling off on a perfectly dry day. Either way the client blames the beams.
Compare each humidity sensor with a calibrated hand-held reference in steady conditions, record both readings, and set a recheck interval in the maintenance plan.
Prove it by action
No public method covers dew point protection on beams step by step, so this is a practical approach built on published principles:
- Check the sensors against a reference first.
- Raise the signal. Simulate a higher dew point at the input, or at the sensor itself, past the threshold.
- Watch the response. The water temperature should rise, or the valve should close, exactly as the control description says.
- Trip the condensation sensor for real where one is fitted - not with a jumper at the panel - and check the valve closes and an alarm is raised.
- Remove the condition and check the system recovers on its own.
- Record the threshold, the margin, who set it and what the sensor read against the reference.
Real proof needs real weather, so trend dew point, water temperature and valve positions in the first humid spell. BSRIA BG 44/2013 covers seasonal commissioning, and the plan should say who returns and when (BSRIA publications).
The air side matters too
On active beams the primary air carries the dehumidifying. If the air handling unit's cooling coil stops drying - a valve in hand, a supply setpoint raised for energy, a reset strategy that ignores moisture - the room's dew point climbs and the beams lose capacity as the guards act. On fixed-nozzle beams fed from VAV, a damper that lowers the duct pressure also cuts induction and water-side cooling, so a beam can lose output because of the air side. Approved Document L allows an extra 0.3 W/(l·s) on a system's specific fan power limit for active chilled beams (2026 edition, Table 5.9, note 3) (Approved Document L Volume 2, 2026).
Any chilled water reset strategy must respect the dew point duty too. Lowering the flow temperature to recover capacity on a hot afternoon is exactly what the guards are there to stop.
Fan coils - condensate by design
Fan coils run colder water and make condensate as part of their job, so the duty shifts from avoiding it to removing it. Public guidance on fan coil condensate is thin. UK healthcare guidance for air handling plant proves a drain by putting water in the tray and watching it clear (HTM 03-01 Part A, 11.25), and the same idea works here.
Installing the drain and proving its fall belong to the mechanical contractor. The BMS engineer's job is the signal: where there is a float switch or condensate pump alarm, have it tripped for real and check what follows - alarm raised, cooling valve closed, fan as the sequence says. Cassettes often have a lift pump; floor units often drain by gravity with no signal to prove, and the plan should say who checks them. Never open a mains compartment to test a float - ask a competent electrician to isolate first.
A dew point check for clients
For a building with beams or chilled ceilings, a short check before summer pays for itself: humidity sensors against a reference, a simulated rise on each guard, a condensation sensor trip on a sample of zones, the air handling unit's drying confirmed, and a trend set up for the first humid week. Commissioning a BMS sets out the wider proving sequence, and Signals that lie the wiring faults that can make a humidity sensor read wrong.
Sources mentioned: CIBSE Journal CPD module on chilled beams (2024, sponsored); HTM 03-01 Part A (NHS England, 2021), 9.214 and 11.25; BSRIA BG 44/2013 Seasonal Commissioning; Approved Document L Volume 2, 2026 edition, Table 5.9 note 3. Dew points are calculated from temperature and humidity; margins and thresholds come from the design. Diagram figures are illustrative.
More info
- Fan coils and chilled beams commissioning - a tecTraining course
- CHW system commissioning - a tecTraining course
- AHU variants - a tecTraining course
Sign in to go straight to the lessons.
Try the tool
- Psychrometrics - in tecTools