MS/TP that stays up - termination, biasing, shields and what the meter should read

BACnet MS/TP is still the bus that connects most field controllers in UK buildings. It is cheap, it runs a long way on a single pair, and when it is installed well it runs for years without anyone thinking about it. When it is not, it produces the most frustrating calls in controls work: devices dropping off and coming back, graphics freezing for seconds at a time, and a front end that blames the network while the network blames the front end.

This article is for integrators and the installers who wire for them. Many MS/TP problems turn out to be physical or settings, and the checks that find them are simple. What follows is a checklist you can hand to a wiring team, and the readings to expect when you go fault finding. Figures come from the BACnet standard, the RS-485 electrical standard behind it and published design guidance; where makers differ, the controller maker's instructions win.

How the bus works, in two paragraphs

MS/TP runs over RS-485, a balanced pair where the receiver reads the difference between the two wires rather than either wire against earth. That is what lets it run for hundreds of metres through a noisy plant room. Only one device can talk at a time, so the master devices pass a token between them in address order. Whoever holds the token may send its frames, then passes it on. Slaves never hold the token; they only answer when asked.

That gives two kinds of failure. Electrical faults corrupt frames, so the token is lost and the bus pauses while a master regenerates it. Settings faults - two devices on one address, one device at the wrong speed - make the token dance between devices that should not answer. Either way, the symptom at the front end looks the same: slow, patchy, then gone. The standard behind both is ANSI/ASHRAE 135, the BACnet standard.

Wiring that stays up

Settings that keep the token moving

What the meter should read

With the bus powered down and isolated safely - follow your safe isolation procedure and the HSE's guidance on electrical safe working - measure resistance across the pair at any point.

Bias resistors and device inputs can pull the reading down a little, so treat it as a guide rather than a pass mark. On a live, idle bus, makers publish expected DC voltages across the pair and from each wire to earth; the figures differ with the biasing used - we have seen published idle figures from about 0.2 V to 0.5 V across the pair - so check the device maker's expected readings rather than carrying one sheet's numbers to another site. A meter tells you nothing about signal quality: a bus that reads perfectly can still be full of retries.

Finding the fault

1. Sort the symptom. Nothing at all on the bus points to a short, a reversed pair or the router port. Slow or patchy points to addresses, baud rate, termination, noise or overload. One device missing points to that device - its power, terminals, address, instance or Max_Master. 2. Check the paperwork against the bus. Address list, baud rates and instance numbers, read from every device. 3. Split the bus. Break it in the middle and test the half still connected to the router. Clean? The fault is further out. Not clean? It is nearer. Halve again. Remember the half under test has lost its far terminator. 4. Look at the terminals as you go. Loose cores and long shield tails are common finds. 5. Capture the traffic. An RS-485 adaptor with a protocol analyser shows the token, retries, and which address is causing trouble. Errors that follow a drive starting point to earthing, segregation or the reference wire.

Record what you find - the reading at each end, the address list as found and as left - so the next visit starts from evidence.

For where MS/TP sits beside BACnet/IP, Modbus and the other buses, see Building protocols explained. Once the bus is up, a point that still will not obey is usually being held higher in the BACnet priority array - the next place to look.

Sources mentioned: ANSI/ASHRAE Standard 135 (BACnet), including its MS/TP and cabling clauses; TIA-485-A; T. Kugelstadt, The RS-485 Design Guide (Texas Instruments, SLLA272); S. Karg, Improving BACnet MS/TP (BACnet Today, ASHRAE Journal supplement, 2010, listed in the BACnet bibliography); D. Fisher, Best Practices for MS/TP Wiring (2016); HSE HSG85. Device limits, voltages and cable lists vary by maker - use the installation guide for the exact device fitted.