From report to project: how one service visit becomes an improvement plan
A worked example, using a fictional office, of how the findings from one well-planned BMS service visit become a prioritised improvement plan.
A service visit that ends with a signed sheet is easy for a client to cut. One that ends with a clear findings register is the start of a plan. Here is how that can work, using a fictional building.
The building
A five-storey office, around fifteen years old, with gas boilers, two chillers, four air handling units and fan coils on every floor. Two floors were re-let last year to tenants with different hours. The BMS has been maintained, but only with a quarterly walk-round.
Before the visit
The engineer pulls two weeks of trends remotely. Three things stand out: the AHUs serving the re-let floors run until 10pm every night; heating and cooling valves on several fan coils are open together most afternoons; and one chiller is short-cycling.
On the day
The visit confirms the findings and adds a few more: 37 points in hand, a supply air temperature reset overridden to a fixed value, two failed space sensors and a variable speed drive on a heating pump left at full speed in hand.
The findings register
- Fixed on the day: schedules corrected for the new tenants, unneeded overrides released, the pump drive returned to auto, the reset re-enabled.
- Quick follow-up: replace two space sensors; widen the deadband on the fan coils after agreeing it with the client.
- Investigate: chiller short-cycling - sequencing or controls tuning first, then the chiller provider if needed.
- Propose: sub-metering for the re-let floors, so tenant energy can be recharged and savings shown.
The report
A one-page summary - found, fixed, outstanding - followed by the register with priorities and rough costs, and before-and-after trends for the schedule and pump changes. The metering proposal includes an estimated cost and a simple payback, with the method stated.
The plan
Over the following year the client funds the sensors and sub-metering, and agrees seasonal visits timed to spring and autumn changeover. Once the metering is in, a degree-day-corrected CUSUM chart shows what the changes are worth on this building.
Nothing in this example needs new plant. It needs someone to look at the data, fix what can be fixed and write it up clearly. Our articles The BMS service visit that pays for itself and Selling BMS service go further.