Part L 2026 and the 180 kW rule - what a BACS must do from 24 March 2027

The 2026 edition of Approved Document L, Volume 2 takes effect in England on 24 March 2027. For anyone who installs, replaces or services building automation and control systems (BACS) in buildings other than dwellings, the part that matters most is a short run of paragraphs - 5.76 to 5.85 - that decides when a BACS is expected and what it should be able to do.

This article is for systems integrators first, and for the FM, M&E and property teams who buy from them. It goes through those paragraphs in order, says what each one asks for, and points out where the wording needs care. It is a summary, not legal advice: the Approved Document, the building control body and the project's designer have the final word.

When the 2026 edition applies

The 2026 edition of Volume 2 says on its opening page that it takes effect on 24 March 2027, or 24 September 2027 for building work connected with higher-risk buildings. Until then, the 2021 edition incorporating the 2023 amendments is the one in force. Transitional arrangements - which projects stay under the older edition because notice was given before the change - are set out in Circular 01/2026. A revised version of the 2026 edition followed in September 2026, with the corrections listed in Circular 04/2026.

For a quote written now for work that starts next year, the practical question is simply which edition the project falls under. Ask, and write the answer into the proposal.

The trigger - paragraphs 5.76 to 5.78

The existing-building case is the one most integrators meet. Replacing a head end, a supervisor or a site's controllers on a building over 180 kW is exactly the moment 5.77 bites.

What counts towards 180 kW - paragraphs 5.79 to 5.83

The figure is not the boiler house nameplate. Effective rated output is defined in 5.79 as the combined output of the equipment that heats or cools the internal space in normal operation for the comfort of occupants.

In a survey, list each heat and cooling source with its rated output and say which side of the note it falls on. Two boilers and a standby boiler, a DHW calorifier fed from the same plant and a few split units in a comms room can land either side of 180 kW depending on how they are counted - and the person signing off the count should be the designer, not the controls contractor.

What the system should do - paragraph 5.84

Where a BACS is installed and the building meets the criteria, 5.84 says it should meet all four of these:

1. Standard. Fully comply with BS EN ISO 16484, the BACS series. 2. Energy data. Continuously monitor, log and analyse energy use, and allow it to be adjusted. 3. Benchmark and inform. Benchmark the building's energy efficiency, detect losses of efficiency in heating, ventilation and air-conditioning systems, and tell the person responsible for the facilities or building management about opportunities to improve. 4. Interoperability. Communicate with connected fixed building services and other appliances in the building, and work with fixed building services across different proprietary technologies, devices and makers.

A note then says that a system rated Class A under BS EN ISO 52120-1 meets these requirements. The 2021 edition carried the same four functions in its paragraph 6.72, with the class note pointing to BS EN 15232, which BSI lists as withdrawn and superseded by BS EN ISO 52120-1. Two things changed in the move: the paragraph numbers, and the wording - 2021 asked that the system be "capable of carrying out" the functions, 2026 says it "should meet" them.

5.85 then asks that the control capabilities suit the building, its expected use and the building services specification - a Class A label on a system that is wrong for the building does not answer this.

### A cross-reference to read carefully

As published, 5.84 applies where the building meets the criteria "in paragraphs 5.78 and 5.79". In this edition 5.78 is the below-threshold paragraph and 5.79 the definition of effective rated output; the 180 kW criteria themselves sit in 5.76 and 5.77, which is where the 2021 equivalent (6.72) pointed, to its 6.66 and 6.67. We checked Circular 04/2026: its list of September corrections to Volume 2 does not touch paragraphs 5.76 to 5.85, and the current file on GOV.UK still reads 5.78 and 5.79. Read the paragraph with 5.77, which sends existing-building systems to 5.84 directly, and where it matters on a project, ask the building control body how they read it.

The rest of the document that touches a BACS

What it means for integrators quoting in 2027

Outside England the figures differ. Wales moves from 290 kW in its 2022 edition to 180 kW in its 2026 version, effective 4 March 2027 (Welsh Government); Scotland and Northern Ireland have their own documents. Do not carry the English figure across a border.

The BMS health check shows how a survey can score an existing system against these duties, and Proving savings covers the evidence side once the system is running.

Sources mentioned: Approved Document L, Volume 2, 2026 edition (paragraphs 5.76 to 5.85, Section 7 and paragraph 8.5) and 2021 edition incorporating 2023 amendments (paragraphs 6.66 to 6.73); Circular 01/2026 and Circular 04/2026 (GOV.UK); BSI listings for BS EN ISO 52120-1 and BS EN 15232-1; CIBSE Commissioning Code M (2022); Welsh Government Approved Document L. This is a summary for orientation - check the current documents and your building control body for each project.